Home | | | MIL-STD and MIL-PRF Testing Capabilities MIL-STD and MIL-PRF Testing Capabilities

MIL-STD and MIL-PRF Testing Capabilities

MIL-STD-883 Group A

Test Description MIL-STD-883
Method Condition In House
Salt Spray 1001 -  
Moisture Resistance 1002 II  
Mechanical Shock 2004 -
Barometric Pressure 3001 -
Internal Visual 2017 -
Stabilization Bake 1008 24 hrs @ 150°C
Temperature Cycle 1010 -65°C to 150°C
Constant Acceleration 2001 5000 G y1
Hermetic Seal (Fine & Gross) 1014 A and C
Burn In 1015 168 hrs @ 85°C
External Visual 2009 -
Steady State Life 108 D
Test Description MIL-STD-202
Method Condition
Vibration 204 G
Thermal Shock 107 A-1
Salt Spray 1009 A
Moisture Resistance 106 -
Mechanical Shock 213 I
Barometric Pressure 105 C
Resistance to Solder Heat 210 B
Lead Integrity 2004 B2
Test Method Conditions (PI)
External Visual 2009  
PIND 2020  
Temperature Cycling 1010 C, 20 Cycles
Temperature Cycling 1010 C, 10 Cycles
Mechanical Shock 2002 B, Y1 Direction or 3000 g's, Y1 Direction
Seal (Fine and Gross) 1014  
Visual Examination 1010  
Endpoint Electrical *  
Steady state life 1005 1000 hours at 125°C or equivalent (1005)
Endpoint Electrical *  
Internal Water Vapor 1018  
Internal Visual and Mechanical 2014  
Wire bond strength 2011  
Element Shear 2019  
ESD 3015  
* in accordance with the applicable device specification

Description Method Condition (PI)
Thermal Shock 1011 C
Stabilization Bake 1008 150°C, 1 Hour
Lead Integrity 2004 B2
Seal (Fine and Gross) 1014 A, D
Salt Atmosphere 1009 A, D
Metal Package Isolation 1003 600 V DC , 100 nA Max.

Test Method Conditions (PI)
Preseal Burn-in 1030  
Non-Destructive Bond Pull 2023  
Internal Visual 2017  
Temperature Cycling 1010 C, 10 Cycles
Mechanical Shock or Constant Acceleration 2002/2001 B, (Y1 Direction) 3000 g's, Y1 Direction only
PIND 2020 Condition A shall be used for Class K,
unless otherwise specified.
Pre Burn-in Electrical *  
Burn-in 1015  
Final Electrical Test *  
Seal (Fine and Gross) 1014  
Radiographic** 2012  
External Visual 2009  
 * in accordance with the applicable device specification
** Will be designed to meet requirements, but Radiographic Test Results not included.