| MIL-STD-883 Group A |
| Test |
MIL-STD-883 |
| Description |
Method |
Condition |
In House |
| Salt Spray |
1001 |
- |
|
| Moisture Resistance |
1002 |
II |
|
| Mechanical Shock |
2004 |
- |
 |
| Barometric Pressure |
3001 |
- |
 |
| Internal Visual |
2017 |
- |
 |
| Stabilization Bake |
1008 |
24 hrs @ 150°C |
 |
| Temperature Cycle |
1010 |
-65°C to 150°C |
 |
| Constant Acceleration |
2001 |
5000 G y1 |
 |
| Hermetic Seal (Fine & Gross) |
1014 |
A and C |
 |
| Burn In |
1015 |
168 hrs @ 85°C |
 |
| External Visual |
2009 |
- |
 |
| Steady State Life |
108 |
D |
 |
|
| |
| MIL-STD-202 Group B |
| Test |
MIL-STD-202 |
| Description |
Method |
Condition |
| Vibration |
204 |
G |
| Thermal Shock |
107 |
A-1 |
| Salt Spray |
1009 |
A |
| Moisture Resistance |
106 |
- |
| Mechanical Shock |
213 |
I |
| Barometric Pressure |
105 |
C |
| Resistance to Solder Heat |
210 |
B |
| Lead Integrity |
2004 |
B2 |
|
| |
| MIL-PRF-38534F Group C |
| Test |
Method |
Conditions (PI) |
| External Visual |
2009 |
|
| PIND |
2020 |
|
| Temperature Cycling |
1010 |
C, 20 Cycles |
| Temperature Cycling |
1010 |
C, 10 Cycles |
| Mechanical Shock |
2002 |
B, Y1 Direction or 3000 g's, Y1 Direction |
| Seal (Fine and Gross) |
1014 |
|
| Visual Examination |
1010 |
|
| Endpoint Electrical |
* |
|
| Steady state life |
1005 |
1000 hours at 125°C or equivalent (1005) |
| Endpoint Electrical |
* |
|
| Internal Water Vapor |
1018 |
|
| Internal Visual and Mechanical |
2014 |
|
| Wire bond strength |
2011 |
|
| Element Shear |
2019 |
|
| ESD |
3015 |
|
* in accordance with the applicable device specification |
|
| |
| MIL-PRF-38534F Group D |
| Description |
Method |
Condition (PI) |
| Thermal Shock |
1011 |
C |
| Stabilization Bake |
1008 |
150°C, 1 Hour |
| Lead Integrity |
2004 |
B2 |
| Seal (Fine and Gross) |
1014 |
A, D |
| Salt Atmosphere |
1009 |
A, D |
| Metal Package Isolation |
1003 |
600 V DC , 100 nA Max. |
|
| |
| MIL-PRF-38534F Class K |
| Test |
Method |
Conditions (PI) |
| Preseal Burn-in |
1030 |
|
| Non-Destructive Bond Pull |
2023 |
|
| Internal Visual |
2017 |
|
| Temperature Cycling |
1010 |
C, 10 Cycles |
Mechanical Shock or Constant Acceleration |
2002/2001 |
B, (Y1 Direction) 3000 g's, Y1 Direction only |
| PIND |
2020 |
Condition A shall be used for Class K, unless otherwise specified. |
| Pre Burn-in Electrical |
* |
|
| Burn-in |
1015 |
|
| Final Electrical Test |
* |
|
| Seal (Fine and Gross) |
1014 |
|
| Radiographic** |
2012 |
|
| External Visual |
2009 |
|
* in accordance with the applicable device specification ** Will be designed to meet requirements, but Radiographic Test Results not included. |
|